Cutting Edge Core Drilling, Inc.    
Home
Tooling
Sample the Sampling
Packer Preview
Project  Resume
Exploring The Logic of Lithology.
 

We will approach most standard soil sample borings with continuous sampling to 10 feet. The borings will then be advanced on 5-foot increments for the next appropriate sample depth. Hollow stem augers or casing is applied upon the necessary soil conditions.

Our crews can log and process samples on site per client request. Shelby tubes and split spoons samplers are extracted on site, labeled, logged and placed into ziplock baggies.

NQ2 cores are site extracted, labeled, logged, and bagged up. Each core run will have a sample bagged up every two feet.